Results 1 to 2 of 2
  1. #1

    Default U Field House Getting $7.4 M in Upgrades

    http://www.startribune.com/u-of-m-s-...urf/487434441/

    The University of Minnesota’s Field House will sport a new exterior envelope under a recently approved $7.4 million renovation that will also see the installation of a new track and artificial-turf flooring.

    Inside, meanwhile, the building will get ventilation and mechanical systems suitable for supporting crowds of up to 1,500 people; and 80,000 square feet of new track and turf flooring, bringing the facility up to the standards necessary to host NCAA-level intercollegiate indoor track-and-field events.


  2. #2

    Default

    Little ways away from the outdoor track, but I guess not much you can do about that. Space is tough to find.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •